Round Non-Fried Instant Noodles Machine and Cup Noodle Production Line

Product Details
Customization: Available
After-sales Service: Product Warranty and Repair Services
Warranty: 1 Years
Diamond Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (23)
  • Round Non-Fried Instant Noodles Machine and Cup Noodle Production Line
  • Round Non-Fried Instant Noodles Machine and Cup Noodle Production Line
  • Round Non-Fried Instant Noodles Machine and Cup Noodle Production Line
  • Round Non-Fried Instant Noodles Machine and Cup Noodle Production Line
  • Round Non-Fried Instant Noodles Machine and Cup Noodle Production Line
  • Round Non-Fried Instant Noodles Machine and Cup Noodle Production Line
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Our Advantages
  • Packaging & Shipping
  • Exhibition
  • FAQ
Overview

Basic Info.

Model NO.
500
Voltage
220V
Certification
ISO, CE
Capacity
20000-300000 Pics Per 8 Hours
Advantage
Easy Operation High Efficiency
Keywords
Automatic Noodle Making Machine
Raw Material
Grain Flour
Material
304/316 Stainless Steel
Applicable Industries
Plant
After Warranty Service
Repair Service
Certificate
CE ISO
Function
Multi-Function, Health
Type
Fully Automatic Processing Line
Single Gross Weight
68000kg
Single Package Size
55000X600X400 Cm
Automatic Grade
Automatic
Weight
20000 Kg
Product Type
Flour
Transport Package
Sea
Specification
50m*5m*4m
Trademark
kingdoo
Origin
Henan, China
HS Code
84381000
Production Capacity
30000-300000prieces/8h

Product Description


 
Product Description
Non-Fried Instant Noodle Production Line
Round Non-Fried Instant Noodles Machine and Cup Noodle Production Line
Non-fried instant noodles production line includes salt water mixing and measuring, flour mixing,dough aging, dough pressing, steaming, cutting and dividing, drying, air cooling, packaging. The entire line adopts steam heating method and it can produce square dried noodles or circular dried noodles, with a production capacity 20000 to 300000 pieces in 8 hours.
Detailed Photos

 


Round Non-Fried Instant Noodles Machine and Cup Noodle Production Line

Product Parameters

Model

power

Steam consumption

Dimension(m)
(multi- layer steamer)

Worker

30,000pieces/8h

50kw

1000-1200KG/H

50*5*4

4

60,000pieces/8h

65kw

1500-1700KG/H

55*5*4

4

80,000pieces/8h

80kw

2000-2200KG/H

65*6*4

5

120,000pieces/8h

95kw

2400-2600KG/H

75*6*4

5

160,000pieces/8h

115kw

2800-3000KG/H

85*7*4.5

5

200,000pieces/8h

130kw

3200-3400KG/H

95*8*4.5

6

250,000pieces/8h

140kw

3600-3800KG/H

105*8*4.5

6

300,000pieces/8h

155kw

3800-4000KG/H

120*10*4.5

6

 
Our Advantages
Round Non-Fried Instant Noodles Machine and Cup Noodle Production Line

 

Packaging & Shipping

Round Non-Fried Instant Noodles Machine and Cup Noodle Production Line

Exhibition

Round Non-Fried Instant Noodles Machine and Cup Noodle Production Line

FAQ

Q   What's the difference between fried instant noodle and dried noodle?
A    Fried instant noodle has oil ,we can put noodle into hot water and just wait 2-3 minutes,then can eator just eat noodle directly without adding  water. Dried noodle need be boiled.
Q    Noodle shape and machine capacity ?
A     There are two shapes, square and round shape. Capacity is from 20,000 pieces to 300,000pieces 8 hours.Workshop need 30 to 90 meters long.
Q      Instant noodle line steam and electric consumption ?
A     Accord different capacity, steam comsumption is from 1000kg/hour to 3500kg/hour Electric consumption is from 40kw to 150kw .
Q     You are a trading company or manufacturer ?
A      We are real factory which has over 30 years experience for making noodle machine.Our factory locate in Keii road 16th.Mazhai industrial  Zone,Eergi District.Zhengzhou City,Henan Province,China which near Xinzheng Internationa Airport.
Q    Noodle machine delivery time?
A      Delivery time is 45-60 days for single machineDelivery time is 60-90 days for whole production line

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier